Sustainability starts before the license and continues after it
In an infrastructure, energy, mining or industrial project, sustainability is often read as the licensing stage: a study, a hearing, a license. In practice it starts earlier, with the decision on where and how the business will be built, and continues after the license, in construction, operation and reporting results. When each stage is well handled, the project gains social license, access to credit and predictability. When one fails, the cost shows up as delay, complaints, litigation or a reputation crisis.
From concept to closure
The cycle has phases that feed one another.
- Concept. Location, technology and project design define who will be affected and which impacts can be avoided. Mapping stakeholders at this stage is cheaper than remediating later.
- Licensing. Environmental studies, socioeconomic diagnosis, consultations and hearings produce the conditions the developer will take on.
- Implementation. Environmental and social programs leave the paper, with teams in the field, communication with communities and a channel to receive complaints.
- Operation and monitoring. Conditions become a routine of follow-up, with indicators, reports to the agencies and feedback to communities.
- Continuity and closure. Commitments continue until the project ends, and the relationship built along the way weighs on renewals, expansions and new projects.
What sustains this cycle is people present in the territory. Field teams who know the leaders, explain the schedule, record doubts and bring back answers make information circulate before it turns into rumor.
A network of institutions, at three levels
Licensing and community relations involve many institutions, and knowing who decides and who comments avoids rework.
- National. Under Complementary Law 140/2011, the Federal Government licenses, for example, projects on Indigenous lands, in federal conservation units (except APAs), in two or more states, in the territorial sea and in the exclusive economic zone. Ibama carries it out. According to the Ibama page on federal licensing, the agencies involved include Funai, when there is Indigenous land, Incra, when there is quilombola land, Iphan, when there are protected cultural assets, and ICMBio and conservation unit managers, when there is impact on them.
- State. State environmental agencies license activities that fall to neither the Federal Government nor municipalities, plus state conservation units, except APAs.
- Municipal. Municipalities license local-impact activities, as typified by state environment councils, and draw up the master plan observing environmental zoning. The General Environmental Licensing Law (Law 15,190/2025) keeps municipal land use rules applicable, even though environmental licensing does not depend on the municipal certificate.
Each project is licensed by a single federative entity, and the others may comment in a non-binding way, under LC 140. This does not reduce the number of counterparts. City governments, councils, watershed committees, prosecutors, civil defense, residents' associations and traditional communities keep having a say, at the hearing or outside it. Law 15,190 provides, in processes with an environmental impact study, at least one public hearing before the decision on the preliminary license, with the EIA and Rima available 45 days in advance, and public consultation of 15 to 60 days.
What multilateral banks recommend
For projects seeking financing from development banks or institutions that follow international standards, stakeholder engagement is a requirement. The references below follow the same logic.
- World Bank. Environmental and Social Standard 10 (ESS10) requires meaningful consultation with all stakeholders, with timely, understandable and accessible information, in a culturally appropriate format and free of manipulation, interference, coercion, discrimination and intimidation. Engagement involves six elements: identification and analysis, planning, information disclosure, consultation, addressing grievances and reporting to stakeholders. The Bank's guidance pays special attention to disadvantaged or vulnerable groups and provides for a Stakeholder Engagement Plan (SEP), updated during implementation.
- IFC. In Performance Standard 1, engagement is an ongoing process, with analysis and planning, disclosure, consultation and participation, a grievance mechanism and reporting to affected communities. For projects with potentially significant adverse impacts, the client conducts an informed consultation and participation process (paragraph 31). The grievance mechanism must be scaled to risks and have communities as its primary users (paragraph 35), and periodic reports to affected communities must occur at least once a year (paragraph 36). With Indigenous Peoples, Standard 7 addresses free, prior and informed consent in specific circumstances.
- Equator Principles. In the fourth version (EP4), signatory banks require, for Category A and B projects, effective and ongoing engagement (Principle 5), a free-of-charge grievance mechanism with no retaliation (Principle 6) and independent monitoring and reporting over the life of the loan (Principle 9). Disclosure of risks and impacts must occur early, in any case before construction starts, and in local language.
- IDB. The IDB Environmental and Social Policy Framework, approved in 2020 and in force since 2021, has ten performance standards, one of them on stakeholder engagement and information disclosure. The bank keeps a grievance management mechanism for affected people and communities, and complainants do not need to exhaust the project channel first. In 2024, the IDB received 75 environmental and social complaints, 58 of them admissible.
In short, the documents ask that dialogue start early, be recorded, reach people in accessible language and channels, and continue as long as the project exists.
What GRI and IFRS ask to be developed, monitored and reported
Sustainability reporting standards address the same cycle, from the side of what the company discloses.
- GRI. The Universal Standards, in effect for reporting from 2023, ask the organization to describe how it engages its stakeholders (GRI 2-29), define material topics from its most significant impacts on the economy, the environment and people (GRI 3), and explain how it prevents, mitigates and remediates negative impacts (GRI 2-25) and how it provides mechanisms to seek advice and raise concerns (GRI 2-26). For local communities, GRI 413 covers operations with engagement, impact assessments and development programs, and operations with significant negative impacts.
- IFRS S1 and S2. The ISSB standards ask for information on sustainability-related risks and opportunities that could affect the company's cash flows, access to finance and cost of capital, organized in four pillars: governance, strategy, risk management, metrics and targets. S2 applies the logic to climate.
In practice, reporting under these standards requires a structure set up in advance. The company will need up-to-date maps of stakeholders and communities, a materiality analysis identifying the most significant impacts, socio-environmental and physical and transition risk diagnoses, with scenarios, and a grievance channel with records and response deadlines. It will also need systems to collect, record and trace indicators back to their source, such as complaints handled, conditions met and emissions, and a governance setup with defined owners at the executive and board levels. This calls for professionals with experience in field social surveys, communication and community relations, risk management, data, finance and internal controls and, where there is independent verification, assurance. Companies that already keep the mapping and records from licensing start with much of this base in place.
In Brazil, the Securities Commission (CVM) announced on October 29, 2026 a public call for input on the topic and stated that, in 2026, CVM Resolution 244 removed the general mandate for the report and kept adoption voluntary. A mandate may return to the agenda, and what holds today is the logic: sustainability information that investors and lenders use to decide.
Done well, risk becomes opportunity
Each link in the cycle has a risk side and an opportunity side, and execution quality decides which one appears.
- Stakeholder mapping. Without it, affected groups appear late, often at the hearing. With it, their demands enter the project and the license conditions.
- Grievance channel. Without one, complaints go to prosecutors, the press or the lender. With an accessible channel, they become management information and are solved early.
- Monitoring and reporting. Without data, the company defends itself with speeches. With indicators tracked and published, it demonstrates compliance and supports license renewals.
- People in the field. Without presence, rumor takes the place of information. With a known team, the company learns what the community expects before expectation turns into conflict.
- Consistent reporting. Without it, the lender sees no risk control. With it, the company speaks the language of banks and investors and eases access to credit and review of its conditions.
The effect adds up. Fewer surprises in licensing reduce delay, and delay is among the highest costs of a project. A relationship built with the community lowers the chance that an incident becomes a crisis. And a documented record of compliance is an asset when raising funds, renewing licenses or proposing an expansion.
Talk to KICK
KICK Group works at the ends of this cycle: stakeholder mapping, social communication and engagement plans, environmental education programs, field teams, grievance channels, monitoring and reporting. If your project is at concept, licensing or operation, it is worth talking about where the risks and opportunities are.